Construction Cost Summary
Project Name:           Date:    
Location:           Area:    
DIV.  SYSTEM TOTAL COST   Sub System UOM-Unit of  Quant. Total Cost Total Cost Cost Per
NO.   PER SYSTEM     Measure   Per UOM $ US SQF
  DEMOLITION     Demolition          
01 FOUNDATION   011 Standard Foundations FPA        
      012 Special Foundations FPA        
02 SUB STRUCTURE   021 Slab on Grade FPA        
      022 Basement Excavation BCF        
      023 Basement Walls BWA        
03 SUPER STRUCTURE   031 Floor Construction UFA        
      032 Roof Construction SQF        
      033 Stair Construction FLT        
04 EXTERIOR CLOSURE   041 Exterior Walls XWA        
      042 Exterior Doors & Windows XDA        
05 ROOFING   05 Roofing SQF        
06 CONSTRUCTION   061 Partitions PSM        
      062 Interior Finishes TFA        
      063 Specialities  GSF        
07 CONVEYING SYSTEM   071 Elevators LO        
      072 Escalators & Others LS        
08 MECHANICAL   081 Plumbing FXT        
      082 HVAC TON        
      083 Fire Protection AP        
      084 Special Mechanical Systems LS        
09 ELECTRICAL   091 Service & Distribution KVA        
      092 Lighting & Power KVA        
      093 Spec. Electrical System GSF        
        Bldg. Mgmt. System SQF        
        Security System EA        
        CCTV System Riser        
        Underloor System SQF        
        Fire Alarm System & Paging STA        
        PABX System Port        
                   
10 GEN. COND. & PROFIT   101 Site Overhead MOS        
      102 Preliminaries PCT        
11 EQUIPMENT   111 Fixed Equipment LS        
      112 Window hoist LS        
      113 Dock levellers LS        
12 SITE WORK   121 Site Preparation SQF        
      122 Site Improvements SQF        
      123 Site Utilities SQF        
      124 Off-Sitework LS        
                   
              Cost Including Office Overhead & Profit    
            Contingencies      
            Escalation      
              Total Estimated Construction Cost     
 Abbreviations                
AP Area protected PSF Partition Square Foot LF Linear Footage  
BCF Basement Cubic Foot STA Station LO Landing Opening  
BWA Basement Wall Area TFA Total Finishes Area LS Lump Sum  
FLT Flight TON 12000 Btu/h MOS Months  
FXT Fixture Count UFA Upper Floor Area FPA Footprint Area
WS 7
 
GSF Gross Square Foot XDA Exterior Doors & Window Area SQF Square Foot  
KW Kilowatts Connected   XWA Exterior Wall Area   PCT Percent