LIST OF FORMS
No. Description Page No.
WS 1  Attendance
   For initial briefings, interface meetings, and presentation. 372
Phase 1  Information Phase 373
WS 2   Value Engineering Team
   For listing of team members, contributors, and a brief description of team study area. 374
WS 3   Consultation and Document Record
   For recording all significant input from consultants/outside experts during the workshop. 375
WS 4   Cost Summary
   For general purpose cost sheet to record cost data for the information phase of workshop. 376
WS 5   General Purpose Model
   For use in modeling: initial, life cycle costs, energy, space, etc. May be expanded and modified as required. 377
WS 6   Cost/Worth Model - Buildings
   For use in VE studies for initial cost modeling using the UniFormat System. 378
WS 7   Construction Cost Summary
   For use in developing building budget or actual estimate using parameter costs in UniFormat. 
Form can be linked to WS 6 - Cost/Worth Model. 379
Phase 2 - Function Phase 380
WS 8  Function Analysis
   For use as a general purpose sheet to do a function analysis. 381
WS 9  Function Analysis - Buildings
   For performing a function analysis for building using UniFormat Costing System. 
Form can be linked to WS 6 - Cost/ Worth Model. 382
WS 10 FAST Diagram - Procedures
    For guidelines on how to prepare the FAST Diagram. 384
WS 11 FAST Diagram 
   For use as a form to do a FAST Diagram. 385
Phase 3 -  Creative Phase 386
WS 12   Creative/Evaluation Sheet 387
   For listing ideas generated during creativity/brainstorming phase.
Figure 1   Idea Stimulator Checklist
   For aiding in the creativity efforts. 388
Phase 4 -  Analysis/Judicial  Phase 389
Analysis/Development Phase 390
WS 13   Life Cycle Cost (Present Worth Method)
   For a comparative evaluation of the total cost of alternatives over a given life cycle and interest rate. 391
WS 13 Example: Life Cycle Cost (Present Worth Method) 
   For an example of the use of the form. 392
Table 1 Present Worth of an Escalating Annual Amount, 10% Discount Rate  393
Table 2 Present Worth (PW) 393
Table 3 Present Worth of Annuity 394
Table 4 Periodic Payment 394
Analysis/Evaluation Phase 395
WS 14 Weighted Evaluation
   For selecting the optimum choice of competing alternates using weighted criteria
 and an analysis matrix for ranking. 396
WS 14 Example: Weighted Evaluation
   For an example of the use of the form. 397
Phase 5 Recommendation 398
WS 15 Value Engineering Recommendation
   For writing up proposals. 399
WS 16 Cost Worksheet
   For generating the original design and proposed alternative/s costs. 400
WS 17 Summary of Potential Cost Savings
   For preparing a summary of all the proposals and their costs. 401
Phase 6 Presentation & Implementation 402
Figure 2 Outline for Team Presentation
   For assisting the team in preparing the verbal presentation. 403